← Back to Co. Antrim

Onshore wind · United Kingdom

Carneatly

Operator North Power Ltd

Application Withdrawn9.2 MWData checked 16 November 2026Source record dated 3 July 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Carneatly is a 9.2 MW wind farm 3.6 km west of Ballycastle, Co. Antrim, United Kingdom. Its planning application (E/2011/0088/F) went to Causeway Coast and Glens on 12 April 2011 and was withdrawn on 7 June 2018. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 9 other energy sites within 10 km, 6 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

87 energy sites within 40 km for Carneatly

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
9.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
North Power Ltd
Location
Ballycastle, Co Antrim, Co. Antrim, United Kingdom
Planning authority
Causeway Coast and Glens
Planning application
E/2011/0088/F
Turbines
4

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for E/2011/0088/F, with what the planning evidence pack adds for this site.

Every application in Causeway Coast and Glens · Alerts for applications and incidents near here

  • 12 April 2011 Planning application submitted
  • 7 June 2018 Application withdrawn

None found. The register holds no published incident that names Carneatly. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Carneatly had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Carneatly; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Carneatly?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 3 July 2018.
Where is Carneatly?
3.6 km west of Ballycastle, Co. Antrim, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).