Battery storage · United Kingdom
Armoy Wind Farm
Operator ABO Wind NI
Appeal RefusedData checked 16 November 2026Source record dated 27 March 2020
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Armoy Wind Farm is a battery storage site 10 km south-west of Ballycastle, Co. Antrim, United Kingdom. Its planning application (LA01/2017/1654/F) went to Causeway Coast and Glens on 22 December 2017 and was refused on appeal on 8 January 2020. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 15 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Armoy Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Co-located with RE)
- Status
- Appeal Refused
- Operator or applicant
- ABO Wind NI
- Location
- Lands approx. 615m East of, 16 Coolkeeran Road, Armoy, 2.5km South East of Armoy, Ballymoney, Co Antrim, Co. Antrim, BT53 8XL, United Kingdom
- Planning authority
- Causeway Coast and Glens
- Planning application
- LA01/2017/1654/F
- Appeal reference
- 2018/A0199
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA01/2017/1654/F, with what the planning evidence pack adds for this site.
Every application in Causeway Coast and Glens · Alerts for applications and incidents near here
Timeline
- 22 December 2017 Planning application submitted
- 24 January 2019 Appeal lodged
- 8 January 2020 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names Armoy Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Armoy Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Armoy Wind Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Armoy Wind Farm?
- Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 27 March 2020.
- Where is Armoy Wind Farm?
- 10 km south-west of Ballycastle, Co. Antrim, United Kingdom (postcode BT53 8XL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).