Armoy Wind Farm is a battery storage site 10 km south-west of Ballycastle, Co. Antrim, United Kingdom. Its planning application (LA01/2017/1654/F) went to Causeway Coast and Glens on 22 December 2017 and was refused on appeal on 8 January 2020. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 15 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 5 other sites and 113 energy sites within 40 km for Armoy Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Co-located with RE)
Status
Appeal Refused
Operator or applicant
ABO Wind NI
Location
Lands approx. 615m East of, 16 Coolkeeran Road, Armoy, 2.5km South East of Armoy, Ballymoney, Co Antrim, Co. Antrim, BT53 8XL, United Kingdom
Planning authority
Causeway Coast and Glens
Planning application
LA01/2017/1654/F
Appeal reference
2018/A0199

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA01/2017/1654/F, with what the planning evidence pack adds for this site.

Every application in Causeway Coast and Glens · Alerts for applications and incidents near here

  • 22 December 2017 Planning application submitted
  • 24 January 2019 Appeal lodged
  • 8 January 2020 Appeal refused

None found. The register holds no published incident that names Armoy Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Armoy Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Armoy Wind Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Armoy Wind Farm?
Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 27 March 2020.
Where is Armoy Wind Farm?
10 km south-west of Ballycastle, Co. Antrim, United Kingdom (postcode BT53 8XL).