Feystown Wind Farm

Appeal Refused13.8 MWChecked 6 October 2026Last changed in the dataset 3 August 2016

Technology
Onshore wind
Capacity
13.8 MW
Status
Appeal Refused
Operator or applicant
ABO Wind NI
Location
Lands east of Feystown Road Glenarm; extending between an area situated approximately 750m east of 54 Feystown Road to lands adjacent to 92 Feystown Road. Within the townlands of Ault alias Gowkstown Clady and Dunteige Glenarm Co Antrim., Co. Antrim, United Kingdom
Planning authority
Mid and East Antrim
Planning application
F/2013/0101/F
Appeal reference
2014/A0285
Turbines
6

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 14 May 2013 Planning application submitted
  • 22 December 2014 Planning permission refused
  • 27 March 2015 Appeal lodged
  • 6 July 2016 Appeal refused

None found. The register holds no published incident that names Feystown Wind Farm. If you know of one, report it (confidential reports are anonymised).

The register holds 54 incidents at onshore wind farms in the United Kingdom, 22 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.