← Back to Co. Antrim
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Wind Turbine Development in Broughshane

Operator Heron Energy Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 21 March 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wind Turbine Development in Broughshane is a wind farm 16 km north-east of Ballymena, Co. Antrim, United Kingdom. Its planning application (LA02/2023/1884/F) went to Mid and East Antrim on 19 October 2023 and was granted on 9 February 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km, 11 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

HERON ENERGY LIMITED (NI701915), active, since 2023. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wind Turbine Development in Broughshane sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1038, Wind turbine reported to have collapsed in Northern Ireland during severe storm, 69 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10382017Wind turbine reported to have collapsed in Northern Ireland during severe storm69 kmSignificant
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire84 kmSignificant
EIR-19512022Investigation begins after turbine fire at Ardrossan wind farm111 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Heron Energy Limited
Location
Lands Approximate 360m Ne of 246 Carnlough Road, Broughshane, Co. Antrim, BT43 7JW, United Kingdom
Planning authority
Mid and East Antrim
Planning application
LA02/2023/1884/F
Turbines
1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA02/2023/1884/F, with what the planning evidence pack adds for this site.

Every application in Mid and East Antrim · Alerts for applications and incidents near here

  • 19 October 2023 Planning application submitted
  • 9 February 2024 Planning permission granted
  • 9 February 2029 Planning permission runs out

None found. The register holds no published incident that names Wind Turbine Development in Broughshane. If you know of one, report it (confidential reports are anonymised).

Has Wind Turbine Development in Broughshane had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wind Turbine Development in Broughshane; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Wind Turbine Development in Broughshane?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 21 March 2024.
Where is Wind Turbine Development in Broughshane?
16 km north-east of Ballymena, Co. Antrim, United Kingdom (postcode BT43 7JW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).