Awaiting Construction0.3 MWChecked 6 October 2026Last changed in the dataset 23 January 2020

Technology
Onshore wind
Capacity
0.3 MW
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Glenview Green Energy
Location
Approximately 402 metres north east of 45 Dickeystown Road, Glenarm, Ballymena, Co. Antrim, BT44 0AB, United Kingdom
Planning authority
Mid and East Antrim
Planning application
LA02/2017/0715/F
Appeal reference
2018/A0096
Turbines
1, 30 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 4 August 2017 Planning application submitted
  • 22 August 2018 Planning permission refused
  • 26 September 2018 Appeal lodged
  • 28 March 2019 Planning permission granted
  • 28 March 2019 Appeal granted
  • 28 March 2024 Planning permission expired

None found. The register holds no published incident that names 402 metres NE of 45 Dickeystown Road. If you know of one, report it (confidential reports are anonymised).

The register holds 54 incidents at onshore wind farms in the United Kingdom, 22 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack sets out every comparable incident for one project, with sources. £295, by email in minutes.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.