← Back to Co. Tyrone

Onshore wind · United Kingdom

Slieve Divena Phase 2 Wind Farm

Operator Scottish and Southern Energy (SSE)

Operational18.8 MWData checked 16 November 2026Source record dated 27 November 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Slieve Divena Phase 2 Wind Farm is a 18.8 MW wind farm 16 km south-east of Omagh, Co. Tyrone, United Kingdom. Its planning application (K/2005/1691/F) went to Fermanagh and Omagh on 13 September 2005 and was granted on 6 June 2007. It has been operating since 16 February 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 24 other energy sites within 10 km, 19 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 48 other sites and 187 energy sites within 40 km for Slieve Divena Phase 2 Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
18.8 MW (this record)
All phases
48.8 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Scottish and Southern Energy (SSE)
Location
Slieve Divena Wind Farm Phase II in the townlands of Altcloghfin, Altamuskin and Shantavny Irish, Co Tyrone, Co. Tyrone, BT79, United Kingdom
Planning authority
Fermanagh and Omagh
Planning application
K/2005/1691/F
First operating
2017
Turbines
8

This record is 18.8 MW, one part of a site built in phases. With Slieve Divena Phase 1 Wind Farm (30 MW) the phases on the register add up to 48.8 MW. Slieve Divena Phase 1 Wind Farm

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for K/2005/1691/F, with what the planning evidence pack adds for this site.

Every application in Fermanagh and Omagh · Alerts for applications and incidents near here

  • 13 September 2005 Planning application submitted
  • 6 June 2007 Planning permission granted
  • 30 May 2016 Construction started
  • 16 February 2017 Operational

None found. The register holds no published incident that names Slieve Divena Phase 2 Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Slieve Divena Phase 2 Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Slieve Divena Phase 2 Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Slieve Divena Phase 2 Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 November 2017.
Where is Slieve Divena Phase 2 Wind Farm?
16 km south-east of Omagh, Co. Tyrone, United Kingdom (postcode BT79).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).