Slieve Divena Phase 1 Wind Farm

Operator Greencoat (formerly Infinis/SSE)

Operational30 MWData checked 16 November 2026Source record dated 23 August 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Slieve Divena Phase 1 Wind Farm is a 30 MW wind farm 16 km south-east of Omagh, Co. Tyrone, United Kingdom. Its planning application (K/2005/0597/F) went to Fermanagh and Omagh on 1 March 2005 and was granted on 17 May 2007. It has been operating since 10 March 2009. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 24 other energy sites within 10 km, 19 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

187 energy sites within 40 km for Slieve Divena Phase 1 Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
30 MW (this record)
All phases
48.8 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Greencoat (formerly Infinis/SSE)
Location
Slieve DivenaSixmilecrossBeraghBallygawleyCounty Tyrone, Co. Tyrone, United Kingdom
Planning authority
Fermanagh and Omagh
Planning application
K/2005/0597/F
First operating
2009
Turbines
12

This record is 30 MW, one part of a site built in phases. With Slieve Divena Phase 2 Wind Farm (18.8 MW) the phases on the register add up to 48.8 MW. Slieve Divena Phase 2 Wind Farm

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for K/2005/0597/F, with what the planning evidence pack adds for this site.

Every application in Fermanagh and Omagh · Alerts for applications and incidents near here

  • 1 March 2005 Planning application submitted
  • 17 May 2007 Planning permission granted
  • 10 March 2009 Operational

None found. The register holds no published incident that names Slieve Divena Phase 1 Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Slieve Divena Phase 1 Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Slieve Divena Phase 1 Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Slieve Divena Phase 1 Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 August 2017.
Where is Slieve Divena Phase 1 Wind Farm?
16 km south-east of Omagh, Co. Tyrone, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).