← Back to Derbyshire

Energy sites / United Kingdom / Derbyshire

Onshore wind · United Kingdom

Sibelco Brassington

Operational2.3 MWChecked 6 October 2026Last changed in the dataset 22 June 2017

Technology
Onshore wind
Capacity
2.3 MW
Status
Operational
Operator or applicant
Sibelco/ Golconda
Location
Manystones Lane Brassington Derbyshire, Derbyshire, United Kingdom
Planning authority
Derbyshire Dales
Planning application
11/00291/FUL
First operating
2016
Turbines
1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 11 April 2011 Planning application submitted
  • 21 March 2012 Planning permission granted
  • 15 February 2015 Construction started
  • 15 September 2016 Operational

None found. The register holds no published incident that names Sibelco Brassington. If you know of one, report it (confidential reports are anonymised).

The register holds 54 incidents at onshore wind farms in the United Kingdom, 22 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.