← Back to Derbyshire

Energy sites / United Kingdom / Derbyshire

Solar · United Kingdom

Curzon Lodge Depot

Application Withdrawn3.3 MWChecked 6 October 2026Last changed in the dataset 4 October 2017

Technology
Solar
Capacity
3.3 MW
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Longcliffe Quarries
Location
Curzon Lodge Depot, Longcliffe, Brassington, Matlock, Derbyshire, DE4 4, United Kingdom
Planning authority
Derbyshire Dales
Planning application
15/00561/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 3 August 2015 Planning application submitted
  • 13 September 2017 Application withdrawn

None found. The register holds no published incident that names Curzon Lodge Depot. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.