Onshore wind · United Kingdom
Ryder Point Quarry Wind Turbines
Operator Longcliffe Quarries
Operational5 MWData checked 16 November 2026Source record dated 23 January 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Ryder Point Quarry Wind Turbines is a 5 MW wind farm 3.3 km west of Wirksworth, Derbyshire, United Kingdom. Its planning application (12/00723/FUL) went to Derbyshire Dales on 21 November 2012 and was granted on 11 July 2013. It has been operating since 15 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 14 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Ryder Point Quarry Wind Turbines changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Longcliffe Quarries
- Location
- Ryder Point Quarry North Of Manystones Lane Brassington Derbyshire, Derbyshire, United Kingdom
- Planning authority
- Derbyshire Dales
- Planning application
- 12/00723/FUL
- First operating
- 2015
- Turbines
- 2
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 12/00723/FUL, with what the planning evidence pack adds for this site.
Every application in Derbyshire Dales · Alerts for applications and incidents near here
Timeline
- 21 November 2012 Planning application submitted
- 11 July 2013 Planning permission granted
- 15 April 2015 Construction started
- 15 December 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Ryder Point Quarry Wind Turbines. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Ryder Point Quarry Wind Turbines had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Ryder Point Quarry Wind Turbines; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Ryder Point Quarry Wind Turbines?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 January 2017.
- Where is Ryder Point Quarry Wind Turbines?
- 3.3 km west of Wirksworth, Derbyshire, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).