Severn Road Solar Park

Operator Bristol City Council

Operational1.8 MWData checked 16 November 2026Source record dated 15 February 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Severn Road Solar Park is a 1.8 MW solar farm 8.6 km south-east of Caldicot, Avon, United Kingdom. Its planning application (14/05915/FB) went to Bristol, City of on 11 December 2014 and was granted on 14 May 2015. It has been operating since 5 February 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 77 other energy sites within 10 km, 55 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 2 other sites and 561 energy sites within 40 km for Severn Road Solar Park

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Bristol City Council
Location
Severn Road, Avonmouth, Avon, BS11 0YL, United Kingdom
Planning authority
Bristol, City of
Planning application
14/05915/FB
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/05915/FB, with what the planning evidence pack adds for this site.

Every application in Bristol, City of · Alerts for applications and incidents near here

  • 11 December 2014 Planning application submitted
  • 14 May 2015 Planning permission granted
  • 5 January 2016 Construction started
  • 5 February 2016 Operational

None found. The register holds no published incident that names Severn Road Solar Park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Severn Road Solar Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Severn Road Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Severn Road Solar Park?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 February 2016.
Where is Severn Road Solar Park?
8.6 km south-east of Caldicot, Avon, United Kingdom (postcode BS11 0YL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).