Solar · United Kingdom

Dominos Pizza Uk & Ireland, Central Park - Solar PV Panels

Operator Dominos Pizza Group Limited (Head Office)

Awaiting Construction1.4 MWData checked 16 November 2026Source record dated 16 August 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dominos Pizza Uk & Ireland, Central Park - Solar PV Panels is a 1.4 MW solar farm 7.6 km west of Stoke Gifford, Gloucestershire, United Kingdom. Its planning application (P24/01382/PNRE) went to South Gloucestershire on 6 June 2024 and was granted on 30 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 81 other energy sites within 10 km, 58 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dominos Pizza Uk & Ireland, Central Park - Solar PV Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1416, Fire at Bristol hospital started in solar panels, 11 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14162025Fire at Bristol hospital started in solar panels11 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol11 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol12 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Dominos Pizza Group Limited (Head Office)
Location
Dominos Pizza Uk & Ireland Limited, Central Park, Bristol, Gloucestershire, BS35 4GH, United Kingdom
Planning authority
South Gloucestershire
Planning application
P24/01382/PNRE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P24/01382/PNRE, with what the planning evidence pack adds for this site.

Every application in South Gloucestershire · Alerts for applications and incidents near here

  • 6 June 2024 Planning application submitted
  • 30 July 2024 Planning permission granted

None found. The register holds no published incident that names Dominos Pizza Uk & Ireland, Central Park - Solar PV Panels. If you know of one, report it (confidential reports are anonymised).

Has Dominos Pizza Uk & Ireland, Central Park - Solar PV Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dominos Pizza Uk & Ireland, Central Park - Solar PV Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Dominos Pizza Uk & Ireland, Central Park - Solar PV Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 August 2024.
Where is Dominos Pizza Uk & Ireland, Central Park - Solar PV Panels?
7.6 km west of Stoke Gifford, Gloucestershire, United Kingdom (postcode BS35 4GH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).