Solar · United Kingdom
The Range Distribution Centre, Severn Beach - Solar panels
Awaiting Construction2.4 MWChecked 6 October 2026Last changed in the dataset 5 August 2025
The site
- Technology
- Solar
- Capacity
- 2.4 MW
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- InRange Limited
- Location
- The Range Distribution Centre, Central Avenue, Severn Beach, Bristol, Gloucestershire, BS35 4EL, United Kingdom
- Planning authority
- South Gloucestershire
- Planning application
- P25/01358/PNRE
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Timeline
- 3 June 2025 Planning application submitted
- 28 July 2025 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names The Range Distribution Centre, Severn Beach - Solar panels. If you know of one, report it (confidential reports are anonymised).
Follow The Range Distribution Centre, Severn Beach - Solar panels
Get one email when this site's status changes in the Renewable Energy Planning Database (UK government), or when the register publishes an incident that names it. Free, no account needed, unsubscribe in one click.
By following you agree to the privacy policy.
Incidents at solar farms in the United Kingdom
The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.
- Fire involving solar panels at a Market Harborough house spreads to an adjoining property
- Solar inverter fire on agricultural building in Shropshire
- Fire damages solar panel batteries in a Teignmouth garage
- Fire damages roof with one solar panel in The Charltons
- Solar panels on flat roof alight at terraced building in Newquay
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack sets out every comparable incident for one project, with sources. £295, by email in minutes.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.