Planning pack for this site, £295Other options

Solar · United Kingdom

Bottle Yard Studios (TBY2) - Solar panels

Operator Bristol City Council

Awaiting Construction1 MWData checked 16 November 2026Source record dated 19 April 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bottle Yard Studios (TBY2) - Solar panels is a 1 MW solar farm 4.9 km south of Bristol, Gloucestershire, United Kingdom. Its planning application (22/01588/RE) went to Bristol, City of on 29 March 2022 and was granted on 27 June 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 47 other energy sites within 10 km, 37 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bottle Yard Studios (TBY2) - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1416, Fire at Bristol hospital started in solar panels, 3.6 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14162025Fire at Bristol hospital started in solar panels3.6 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol3.6 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol3.8 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Bristol City Council
Location
Kelston Precision Gearings Hawkfield Way Bristol, Gloucestershire, BS14 0BD, United Kingdom
Planning authority
Bristol, City of
Planning application
22/01588/RE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/01588/RE, with what the planning evidence pack adds for this site.

Every application in Bristol, City of · Alerts for applications and incidents near here

  • 29 March 2022 Planning application submitted
  • 27 June 2022 Planning permission granted

None found. The register holds no published incident that names Bottle Yard Studios (TBY2) - Solar panels. If you know of one, report it (confidential reports are anonymised).

Has Bottle Yard Studios (TBY2) - Solar panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bottle Yard Studios (TBY2) - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bottle Yard Studios (TBY2) - Solar panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 April 2022.
Where is Bottle Yard Studios (TBY2) - Solar panels?
4.9 km south of Bristol, Gloucestershire, United Kingdom (postcode BS14 0BD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).