Solar · United Kingdom

Sandhill Farm, Picketts Hill - Solar panels

Operator Knightsbridge Farms Limited

Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 28 October 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Sandhill Farm, Picketts Hill - Solar panels is a 0.4 MW solar farm 3.1 km north of Bordon, Hampshire, United Kingdom. Its planning application (27877/026) went to East Hampshire on 31 October 2022 and was granted on appeal on 2 October 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 22 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Sandhill Farm, Picketts Hill - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1531, Fire involving solar panels damages roof of flats in Fleet, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15312022Fire involving solar panels damages roof of flats in Fleet14 kmSignificant
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing20 kmMinor
EIR-20762020Fire across four homes in Leigh Park most likely linked to solar panel equipment, fire service says33 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Knightsbridge Farms Limited
Location
Sandhill Farm, Picketts Hill, Headley, Bordon, Hampshire, GU35 8TF, United Kingdom
Planning authority
East Hampshire
Planning application
27877/026
Appeal reference
APP/M1710/W/23/3331309

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 27877/026, with what the planning evidence pack adds for this site.

Every application in East Hampshire · Alerts for applications and incidents near here

  • 31 October 2022 Planning application submitted
  • 14 April 2023 Planning permission refused
  • 2 October 2024 Planning permission granted
  • 2 October 2024 Appeal granted
  • 2 October 2027 Planning permission runs out

None found. The register holds no published incident that names Sandhill Farm, Picketts Hill - Solar panels. If you know of one, report it (confidential reports are anonymised).

Has Sandhill Farm, Picketts Hill - Solar panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sandhill Farm, Picketts Hill - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Sandhill Farm, Picketts Hill - Solar panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 October 2024.
Where is Sandhill Farm, Picketts Hill - Solar panels?
3.1 km north of Bordon, Hampshire, United Kingdom (postcode GU35 8TF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).