← Back to Hampshire

Solar · United Kingdom

Wilsom Farm

Operator Canadian solar

Operational11 MWData checked 16 November 2026Source record dated 28 July 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wilsom Farm is a 11 MW solar farm on the edge of Alton, Hampshire, United Kingdom. Its planning application (55465/001) went to East Hampshire on 20 January 2015 and was granted on 2 November 2015. It has been operating since 31 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 19 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 7 other sites and 432 energy sites within 40 km for Wilsom Farm

Members see the sites and incidents around this one, and every record behind them.

CANADIAN SOLAR UK LTD (09061578), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
11 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Canadian solar
Location
Cakers Lane, East Worldham, Alton, Hampshire, Hampshire, GU34 3AB, United Kingdom
Planning authority
East Hampshire
Planning application
55465/001
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 55465/001, with what the planning evidence pack adds for this site.

Every application in East Hampshire · Alerts for applications and incidents near here

  • 20 January 2015 Planning application submitted
  • 2 November 2015 Planning permission granted
  • 21 December 2015 Construction started
  • 31 March 2016 Operational

None found. The register holds no published incident that names Wilsom Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Wilsom Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wilsom Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wilsom Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2016.
Where is Wilsom Farm?
On the edge of Alton, Hampshire, United Kingdom (postcode GU34 3AB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).