Solar · United Kingdom

Royston Solar Farm (Phase 1) (a)

Operator Canadian Solar

Operational5 MWData checked 16 November 2026Source record dated 4 March 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Royston Solar Farm (Phase 1) (a) is a 5 MW solar farm on the edge of Royston, Cambridgeshire, United Kingdom. Its planning application (S/1427/14/FL) went to South Cambridgeshire on 1 July 2014 and was granted on 29 October 2014. It has been operating since 29 January 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 22 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 7 other sites and 460 energy sites within 40 km for Royston Solar Farm (Phase 1) (a)

Members see the sites and incidents around this one, and every record behind them.

CANADIAN SOLAR UK LTD (09061578), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Canadian Solar
Location
Land between Railway and Sewage Disposal Works, Royston Road, Melbourn, Cambridgeshire, Cambridgeshire, United Kingdom
Planning authority
South Cambridgeshire
Planning application
S/1427/14/FL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/1427/14/FL, with what the planning evidence pack adds for this site.

Every application in South Cambridgeshire · Alerts for applications and incidents near here

  • 1 July 2014 Planning application submitted
  • 29 October 2014 Planning permission granted
  • 1 December 2015 Construction started
  • 29 January 2016 Operational

None found. The register holds no published incident that names Royston Solar Farm (Phase 1) (a). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Royston Solar Farm (Phase 1) (a) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Royston Solar Farm (Phase 1) (a); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Royston Solar Farm (Phase 1) (a)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 March 2015.
Where is Royston Solar Farm (Phase 1) (a)?
On the edge of Royston, Cambridgeshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).