← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · East Hampshire

Sandhill Farm, Picketts Hill - Solar panels

Awaiting Construction0.4 MWApplication 27877/026Submitted 31 October 2022Granted on appeal 2 October 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
27877/026
Planning authority
East Hampshire
County or area
Hampshire
Nation
England
Technology
Solar
Capacity
0.4 MW
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Knightsbridge Farms Limited
Location
Sandhill Farm, Picketts Hill, Headley, Bordon, GU35 8TF
Appeal reference
APP/M1710/W/23/3331309
  • 31 October 2022 Planning application submitted
  • 14 April 2023 Planning permission refused
  • 2 October 2024 Planning permission granted
  • 2 October 2024 Appeal granted
  • 2 October 2027 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1531, Fire involving solar panels damages roof of flats in Fleet, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15312022Fire involving solar panels damages roof of flats in Fleet14 kmSignificant
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing20 kmMinor
EIR-20762020Fire across four homes in Leigh Park most likely linked to solar panel equipment, fire service says33 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near GU35 8TF is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in East Hampshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.