Solar · United Kingdom
Marsh House Solar Park
Operator Constantine Land Ltd
Operational5.5 MWData checked 16 November 2026Source record dated 14 April 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Marsh House Solar Park is a 5.5 MW solar farm 3.5 km west of Farnham, Hampshire, United Kingdom. Its planning application (53234/001) went to East Hampshire on 6 March 2012 and was granted on appeal on 23 December 2013. It has been operating since 21 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 37 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Marsh House Solar Park changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 5.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Constantine Land Ltd
- Location
- Ne/O Gully Copse, Cheeks Farm Lane, Bentley, Alton, Hampshire, Hampshire, GU34, United Kingdom
- Planning authority
- East Hampshire
- Planning application
- 53234/001
- Appeal reference
- A/13/2189797/NWF
- First operating
- 2015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 53234/001, with what the planning evidence pack adds for this site.
Every application in East Hampshire · Alerts for applications and incidents near here
Timeline
- 6 March 2012 Planning application submitted
- 28 August 2012 Planning permission refused
- 23 December 2013 Planning permission granted
- 23 December 2013 Appeal granted
- 6 June 2014 Construction started
- 21 March 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Marsh House Solar Park. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Marsh House Solar Park had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Marsh House Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Marsh House Solar Park?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 April 2015.
- Where is Marsh House Solar Park?
- 3.5 km west of Farnham, Hampshire, United Kingdom (postcode GU34).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).