Solar · United Kingdom

Roddas, The Creamery - Solar Photovoltaic Array

Operator Roddas

Awaiting Construction2.7 MWData checked 16 November 2026Source record dated 13 November 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Roddas, The Creamery - Solar Photovoltaic Array is a 2.7 MW solar farm 3.1 km north-east of Redruth, Cornwall, United Kingdom. Its planning application (PA23/00424) went to Cornwall on 9 March 2023 and was granted on 8 November 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 29 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Roddas, The Creamery - Solar Photovoltaic Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1543, Fire damages roof space and solar panels on bungalow in Crowan, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15432017Fire damages roof space and solar panels on bungalow in Crowan12 kmSignificant
EIR-15402018Fire in solar panel on house roof in Flushing14 kmMinor
EIR-04742025Solar panel fire tackled on rooftop near Newquay beach20 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
2.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Roddas
Location
Roddas, The Creamery, Wheal Rose, Scorrier, Redruth, Cornwall, TR16 5BU, United Kingdom
Planning authority
Cornwall
Planning application
PA23/00424

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA23/00424, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 9 March 2023 Planning application submitted
  • 8 November 2023 Planning permission granted
  • 8 November 2026 Planning permission expired

None found. The register holds no published incident that names Roddas, The Creamery - Solar Photovoltaic Array. If you know of one, report it (confidential reports are anonymised).

Has Roddas, The Creamery - Solar Photovoltaic Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Roddas, The Creamery - Solar Photovoltaic Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Roddas, The Creamery - Solar Photovoltaic Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 November 2023.
Where is Roddas, The Creamery - Solar Photovoltaic Array?
3.1 km north-east of Redruth, Cornwall, United Kingdom (postcode TR16 5BU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).