Planning application · Solar · Cornwall

Roddas, The Creamery - Solar Photovoltaic Array

Awaiting Construction2.7 MWApplication PA23/00424Submitted 9 March 2023Granted 8 November 2023

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
PA23/00424
Planning authority
Cornwall
Nation
England
Technology
Solar
Capacity
2.7 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Roddas
Location
Roddas, The Creamery, Wheal Rose, Scorrier, Redruth, TR16 5BU
  • 9 March 2023 Planning application submitted
  • 8 November 2023 Planning permission granted
  • 8 November 2026 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1543, Fire damages roof space and solar panels on bungalow in Crowan, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15432017Fire damages roof space and solar panels on bungalow in Crowan12 kmSignificant
EIR-15402018Fire in solar panel on house roof in Flushing14 kmMinor
EIR-04742025Solar panel fire tackled on rooftop near Newquay beach20 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near TR16 5BU is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Cornwall.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.