Pilgrim, Pool Industrial Estate - Solar Panels

Operator EDF Energy Renewables

Awaiting Construction0.8 MWData checked 16 November 2026Source record dated 25 July 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pilgrim, Pool Industrial Estate - Solar Panels is a 0.8 MW solar farm on the edge of Redruth, Cornwall, United Kingdom. Its planning application (PA22/06419) went to Cornwall on 12 July 2022 and was granted on 30 August 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 19 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

EDF ENERGY RENEWABLES LIMITED (06456689), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pilgrim, Pool Industrial Estate - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1543, Fire damages roof space and solar panels on bungalow in Crowan, 7.2 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15432017Fire damages roof space and solar panels on bungalow in Crowan7.2 kmSignificant
EIR-15402018Fire in solar panel on house roof in Flushing15 kmMinor
EIR-04742025Solar panel fire tackled on rooftop near Newquay beach24 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
EDF Energy Renewables
Location
Pilgrim Pool Industrial Estate Pool Redruth, Cornwall, TR15 3RH, United Kingdom
Planning authority
Cornwall
Planning application
PA22/06419

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA22/06419, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 12 July 2022 Planning application submitted
  • 30 August 2022 Planning permission granted

None found. The register holds no published incident that names Pilgrim, Pool Industrial Estate - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Pilgrim, Pool Industrial Estate - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pilgrim, Pool Industrial Estate - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pilgrim, Pool Industrial Estate - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 July 2022.
Where is Pilgrim, Pool Industrial Estate - Solar Panels?
On the edge of Redruth, Cornwall, United Kingdom (postcode TR15 3RH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).