Four Burrows Farm (Extension 2)

Operator Renewable Energy Systems (RES)

Operational6.3 MWData checked 16 November 2026Source record dated 17 December 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Four Burrows Farm (Extension 2) is a 6.3 MW solar farm 6.7 km north-west of Truro, Cornwall, United Kingdom. Its planning application (PA13/01195) went to Cornwall on 20 February 2013 and was granted on 9 July 2013. It has been operating since 3 November 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 33 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 80 other sites and 182 energy sites within 40 km for Four Burrows Farm (Extension 2)

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
6.3 MW (this record)
All phases
15 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Renewable Energy Systems (RES)
Location
Four Burrows Farm Four Burrows Blackwater Cornwall, Cornwall, TR4 8JB, United Kingdom
Planning authority
Cornwall
Planning application
PA13/01195
First operating
2014

This record is 6.3 MW, one part of a site built in phases. With Four Burrows Solar farm (7.2 MW), Four Burrows Solar farm (Extension 1) (1.5 MW) the phases on the register add up to 15 MW. Four Burrows Solar farm · Four Burrows Solar farm (Extension 1)

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA13/01195, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 20 February 2013 Planning application submitted
  • 9 July 2013 Planning permission granted
  • 23 February 2014 Construction started
  • 3 November 2014 Operational

None found. The register holds no published incident that names Four Burrows Farm (Extension 2). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Four Burrows Farm (Extension 2) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Four Burrows Farm (Extension 2); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Four Burrows Farm (Extension 2)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 17 December 2014.
Where is Four Burrows Farm (Extension 2)?
6.7 km north-west of Truro, Cornwall, United Kingdom (postcode TR4 8JB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).