Four Burrows Solar farm (Extension 1)

Operator Inazin Power Ltd

Operational1.5 MWData checked 16 November 2026Source record dated 26 February 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Four Burrows Solar farm (Extension 1) is a 1.5 MW solar farm 7.3 km north-west of Truro, Cornwall, United Kingdom. Its planning application (PA12/02338) went to Cornwall on 28 March 2012 and was granted on 1 March 2013. It has been operating since 23 February 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 36 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 184 energy sites within 40 km for Four Burrows Solar farm (Extension 1)

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1.5 MW (this record)
All phases
15 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Inazin Power Ltd
Location
Land East Of Little Lambriggan Farm (South West Of Higher Callestick Farm) Callestick Cornwall, Cornwall, United Kingdom
Planning authority
Cornwall
Planning application
PA12/02338
First operating
2014

This record is 1.5 MW, one part of a site built in phases. With Four Burrows Solar farm (7.2 MW), Four Burrows Farm (Extension 2) (6.3 MW) the phases on the register add up to 15 MW. Four Burrows Solar farm · Four Burrows Farm (Extension 2)

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA12/02338, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 28 March 2012 Planning application submitted
  • 1 March 2013 Planning permission granted
  • 23 February 2014 Operational

None found. The register holds no published incident that names Four Burrows Solar farm (Extension 1). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Four Burrows Solar farm (Extension 1) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Four Burrows Solar farm (Extension 1); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Four Burrows Solar farm (Extension 1)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 26 February 2014.
Where is Four Burrows Solar farm (Extension 1)?
7.3 km north-west of Truro, Cornwall, United Kingdom.