Solar · United Kingdom
Redeham Hall Solar Farm
Operator INRG Solar
Appeal Refused5.3 MWData checked 16 November 2026Source record dated 23 December 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Redeham Hall Solar Farm is a 5.3 MW solar farm 3.6 km east of Horley, Surrey, United Kingdom. Its planning application (2015/1056) went to Tandridge on 10 June 2015 and was refused on appeal on 5 December 2016. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 38 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Redeham Hall Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 5.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Appeal Refused
- Operator or applicant
- INRG Solar
- Location
- Land at Redeham Hall, Smallfield, Horley, Surrey, Surrey, RH6 9SA, United Kingdom
- Planning authority
- Tandridge
- Planning application
- 2015/1056
- Appeal reference
- APP/M3645/W/16/3146389
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2015/1056, with what the planning evidence pack adds for this site.
Every application in Tandridge · Alerts for applications and incidents near here
Timeline
- 10 June 2015 Planning application submitted
- 15 January 2016 Planning permission refused
- 19 March 2016 Appeal lodged
- 5 December 2016 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names Redeham Hall Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Redeham Hall Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Redeham Hall Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Redeham Hall Solar Farm?
- Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 23 December 2016.
- Where is Redeham Hall Solar Farm?
- 3.6 km east of Horley, Surrey, United Kingdom (postcode RH6 9SA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).