Onshore wind · United Kingdom

Rassau Industrial Estate, Unit 19 - Wind Turbine

Operator Private Developer

Application SubmittedData checked 16 November 2026Source record dated 12 January 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Rassau Industrial Estate, Unit 19 - Wind Turbine is a wind farm 3.3 km north-west of Ebbw Vale, Gwent, United Kingdom. Its planning application (C/2020/0301) went to Blaenau Gwent on 21 December 2020. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 29 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Rassau Industrial Estate, Unit 19 - Wind Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0794, Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch, 28 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07942022Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch28 kmSignificant
EIR-07902022Nordex attributes a Welsh wind turbine collapse to an overspeed condition65 kmMajor
EIR-08742026Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales68 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Private Developer
Location
Unit 19 Rassau Industrial Estate, Gwent, NP23 5SD, United Kingdom
Planning authority
Blaenau Gwent
Planning application
C/2020/0301
Turbines
1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for C/2020/0301, with what the planning evidence pack adds for this site.

Every application in Blaenau Gwent · Alerts for applications and incidents near here

  • 21 December 2020 Planning application submitted

None found. The register holds no published incident that names Rassau Industrial Estate, Unit 19 - Wind Turbine. If you know of one, report it (confidential reports are anonymised).

Has Rassau Industrial Estate, Unit 19 - Wind Turbine had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Rassau Industrial Estate, Unit 19 - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Rassau Industrial Estate, Unit 19 - Wind Turbine?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 12 January 2021.
Where is Rassau Industrial Estate, Unit 19 - Wind Turbine?
3.3 km north-west of Ebbw Vale, Gwent, United Kingdom (postcode NP23 5SD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).