Onshore wind · United Kingdom
Rassau Industrial Estate
Operator Infinite Renewables
Awaiting Construction1.5 MWData checked 16 November 2026Source record dated 25 September 2019
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Rassau Industrial Estate is a 1.5 MW wind farm 3.3 km north-west of Ebbw Vale, Blaenau Gwent, United Kingdom. Its planning application (C/2018/0293) went to Blaenau Gwent on 5 October 2018 and was granted on 19 July 2019. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 29 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Rassau Industrial Estate changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Rassau Industrial Estate sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0794, Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch, 28 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0794 | 2022 | Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch | 28 km | Significant |
| EIR-0790 | 2022 | Nordex attributes a Welsh wind turbine collapse to an overspeed condition | 65 km | Major |
| EIR-0874 | 2026 | Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales | 68 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 1.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Infinite Renewables
- Location
- Unit 18, Rassau Industrial Estate, Rassau, Ebbw Vale, Gwent, Blaenau Gwent, NP23 5SD, United Kingdom
- Planning authority
- Blaenau Gwent
- Planning application
- C/2018/0293
- Turbines
- 1
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for C/2018/0293, with what the planning evidence pack adds for this site.
Every application in Blaenau Gwent · Alerts for applications and incidents near here
Timeline
- 5 October 2018 Planning application submitted
- 19 July 2019 Planning permission granted
- 19 July 2024 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Rassau Industrial Estate. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Rassau Industrial Estate had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Rassau Industrial Estate; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Rassau Industrial Estate?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 September 2019.
- Where is Rassau Industrial Estate?
- 3.3 km north-west of Ebbw Vale, Blaenau Gwent, United Kingdom (postcode NP23 5SD).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).