Battery storage · United Kingdom

Rassau Industrial Estate

Operator Private Developer

Under Construction6 MWData checked 16 November 2026Source record dated 11 January 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Rassau Industrial Estate is a 6 MW battery storage site 3.4 km north-west of Ebbw Vale, Blaenau Gwent, United Kingdom. Its planning application (C/2019/0326) went to Blaenau Gwent on 25 November 2019 and was granted on 22 January 2020. Construction started on 16 July 2021. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 28 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Rassau Industrial Estate sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 90 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire90 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter120 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool178 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Private Developer
Location
Unit 16, Rassau Industrial Estate, Rassau, Ebbw Vale, Blaenau Gwent, NP23 5SD, United Kingdom
Planning authority
Blaenau Gwent
Planning application
C/2019/0326

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for C/2019/0326, with what the planning evidence pack adds for this site.

Every application in Blaenau Gwent · Alerts for applications and incidents near here

  • 25 November 2019 Planning application submitted
  • 22 January 2020 Planning permission granted
  • 16 July 2021 Construction started

None found. The register holds no published incident that names Rassau Industrial Estate. If you know of one, report it (confidential reports are anonymised).

Has Rassau Industrial Estate had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Rassau Industrial Estate; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Rassau Industrial Estate?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 January 2022.
Where is Rassau Industrial Estate?
3.4 km north-west of Ebbw Vale, Blaenau Gwent, United Kingdom (postcode NP23 5SD).