Solar · United Kingdom
Tafarnaubach Industrial Estate
Operator Liberty Tubes
Awaiting Construction0.9 MWData checked 16 November 2026Source record dated 6 August 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Tafarnaubach Industrial Estate is a 0.9 MW solar farm on the edge of Rhymney, Blaenau Gwent, United Kingdom. Its planning application (C/2019/0052) went to Blaenau Gwent on 11 March 2019 and was granted on 8 April 2019. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 29 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Tafarnaubach Industrial Estate changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tafarnaubach Industrial Estate sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1416, Fire at Bristol hospital started in solar panels, 62 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1416 | 2025 | Fire at Bristol hospital started in solar panels | 62 km | Significant |
| EIR-1274 | 2022 | Fire damages rooftop solar panels at We The Curious in Bristol | 62 km | Significant |
| EIR-2065 | 2021 | Loft fire believed caused by a solar panel at Paintworks flats in Bristol | 63 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Liberty Tubes
- Location
- Liberty Tubes Tredegar, Tafarnaubach Industrial Estate, Tredegar, Gwent, Blaenau Gwent, NP22 3AA, United Kingdom
- Planning authority
- Blaenau Gwent
- Planning application
- C/2019/0052
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for C/2019/0052, with what the planning evidence pack adds for this site.
Every application in Blaenau Gwent · Alerts for applications and incidents near here
Timeline
- 11 March 2019 Planning application submitted
- 8 April 2019 Planning permission granted
- 8 April 2024 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Tafarnaubach Industrial Estate. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Tafarnaubach Industrial Estate had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Tafarnaubach Industrial Estate; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Tafarnaubach Industrial Estate?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 August 2020.
- Where is Tafarnaubach Industrial Estate?
- On the edge of Rhymney, Blaenau Gwent, United Kingdom (postcode NP22 3AA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).