Convatec Green Manufacturing Hub

Application Refused15 MWChecked 6 October 2026Last changed in the dataset 19 January 2026

Technology
Onshore wind
Capacity
15 MW
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Convatec Limited
Location
Unit 1 - 2 Heads Of The Valleys Industrial Estate, Rhymney, Tredegar, Gwent, NP22 5RL, United Kingdom
Planning authority
Welsh Government (NSIP)
Planning application
CAS-02977-Y9F1W7
Turbines
3, 150 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 3 April 2025 Planning application submitted
  • 19 November 2025 Planning permission refused

None found. The register holds no published incident that names Convatec Green Manufacturing Hub. If you know of one, report it (confidential reports are anonymised).

The register holds 54 incidents at onshore wind farms in the United Kingdom, 22 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.