Solar · United Kingdom
Cwmtillery Glass Centre, Festival Drive - Solar Panels
Operator Cwmtillery Glass Centre
Awaiting Construction0.8 MWData checked 16 November 2026Source record dated 2 October 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Cwmtillery Glass Centre, Festival Drive - Solar Panels is a 0.8 MW solar farm on the edge of Ebbw Vale, Gwent, United Kingdom. Its planning application (P/2026/0122) went to Blaenau Gwent on 21 July 2026 and was granted on 4 September 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 39 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Cwmtillery Glass Centre, Festival Drive - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cwmtillery Glass Centre, Festival Drive - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1416, Fire at Bristol hospital started in solar panels, 56 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1416 | 2025 | Fire at Bristol hospital started in solar panels | 56 km | Significant |
| EIR-1274 | 2022 | Fire damages rooftop solar panels at We The Curious in Bristol | 56 km | Significant |
| EIR-2065 | 2021 | Loft fire believed caused by a solar panel at Paintworks flats in Bristol | 56 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Cwmtillery Glass Centre
- Location
- CWMTILLERY GLASS CENTRE LTD Festival Drive, Victoria, Gwent, NP23 8XS, United Kingdom
- Planning authority
- Blaenau Gwent
- Planning application
- P/2026/0122
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/2026/0122, with what the planning evidence pack adds for this site.
Every application in Blaenau Gwent · Alerts for applications and incidents near here
Timeline
- 21 July 2026 Planning application submitted
- 4 September 2026 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Cwmtillery Glass Centre, Festival Drive - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Cwmtillery Glass Centre, Festival Drive - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Cwmtillery Glass Centre, Festival Drive - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Cwmtillery Glass Centre, Festival Drive - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 October 2026.
- Where is Cwmtillery Glass Centre, Festival Drive - Solar Panels?
- On the edge of Ebbw Vale, Gwent, United Kingdom (postcode NP23 8XS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).