Onshore wind · United Kingdom
Mynydd James Wind Farm
Operator Pennant Wind Energy Ventures Limited Walters Group
Application Withdrawn31.2 MWData checked 16 November 2026Source record dated 26 October 2005
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Mynydd James Wind Farm is a 31.2 MW wind farm 3.5 km south-east of Brynmawr, Gwent, United Kingdom. Its planning application (2003/0494) went to Blaenau Gwent on 28 July 2006 and was withdrawn on 26 October 2005. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 25 other energy sites within 10 km, 12 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Mynydd James Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 31.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Pennant Wind Energy Ventures Limited Walters Group
- Location
- Coitoi Mountain, Blaenau Gwent, Gwent, United Kingdom
- Planning authority
- Blaenau Gwent
- Planning application
- 2003/0494
- Turbines
- 24
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2003/0494, with what the planning evidence pack adds for this site.
Every application in Blaenau Gwent · Alerts for applications and incidents near here
Timeline
- 26 October 2005 Application withdrawn
- 28 July 2006 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Mynydd James Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Mynydd James Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Mynydd James Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Mynydd James Wind Farm?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 26 October 2005.
- Where is Mynydd James Wind Farm?
- 3.5 km south-east of Brynmawr, Gwent, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).