Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Manmoel Wind Farm

Operator Cenin Renewables · Owner Cenin Holdings LTD

Awaiting Construction28 MWData checked 16 November 2026Source record dated 30 March 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Manmoel Wind Farm is a 28 MW wind farm on the edge of Ebbw Vale, Blaenau Gwent, United Kingdom. Its planning application (DNS/3239181) went to Welsh Government (NSIP) on 4 August 2023 and was granted on 16 October 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 47 other energy sites within 10 km, 21 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

CENIN RENEWABLES LIMITED (07598482), active, since 2011. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Manmoel Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0794, Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch, 25 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07942022Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch25 kmSignificant
EIR-07902022Nordex attributes a Welsh wind turbine collapse to an overspeed condition70 kmMajor
EIR-08742026Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales71 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
28 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Cenin Renewables
Owner
Cenin Holdings LTD
Location
Manmoel Common, near Ebbw Vale, Blaenau Gwent, United Kingdom
Planning authority
Welsh Government (NSIP)
Planning application
DNS/3239181
Turbines
5, 180 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DNS/3239181, with what the planning evidence pack adds for this site.

Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here

  • 4 August 2023 Planning application submitted
  • 16 October 2024 Planning permission granted
  • 16 October 2029 Planning permission runs out

None found. The register holds no published incident that names Manmoel Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Manmoel Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Manmoel Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Manmoel Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 March 2026.
Where is Manmoel Wind Farm?
On the edge of Ebbw Vale, Blaenau Gwent, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).