Wauntysswg Farm, near Tredagar is a 30 MW solar farm on the edge of Tredegar, Blaenau Gwent, United Kingdom. Its planning application (DNS/3213639) went to Welsh Government (NSIP) on 28 July 2018 and was granted on 1 August 2019. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 44 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ELGIN ENERGY HOLDINGS LIMITED (07181686), active, since 2010. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wauntysswg Farm, near Tredagar sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1416, Fire at Bristol hospital started in solar panels, 57 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14162025Fire at Bristol hospital started in solar panels57 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol57 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol58 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
30 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Elgin Energy
Owner
Porto Holdings Limited
Location
Wauntysswg Farm, Abertysswg, Rhymney, Tredegar, Blaenau Gwent, NP22 5BQ, United Kingdom
Planning authority
Welsh Government (NSIP)
Planning application
DNS/3213639

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DNS/3213639, with what the planning evidence pack adds for this site.

Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here

  • 28 July 2018 Planning application submitted
  • 1 August 2019 Planning permission granted
  • 31 July 2024 Planning permission expired

None found. The register holds no published incident that names Wauntysswg Farm, near Tredagar. If you know of one, report it (confidential reports are anonymised).

Has Wauntysswg Farm, near Tredagar had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wauntysswg Farm, near Tredagar; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wauntysswg Farm, near Tredagar?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 September 2020.
Where is Wauntysswg Farm, near Tredagar?
On the edge of Tredegar, Blaenau Gwent, United Kingdom (postcode NP22 5BQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).