← Back to Lincolnshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Ping Europe Limited, Corringham Road - Solar Array

Operator Cactus Energy

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 19 May 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ping Europe Limited, Corringham Road - Solar Array is a 0.3 MW solar farm on the edge of Gainsborough, Lincolnshire, United Kingdom. Its planning application (146307) went to West Lindsey on 20 February 2023 and was granted on 29 March 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 31 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

CACTUS ENERGY SOLUTIONS LTD. (11671549), active, since 2018. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ping Europe Limited, Corringham Road - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster18 kmSignificant
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine56 kmMinor
EIR-12652024Solar panels catch fire and destroy three buildings in Harby60 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Cactus Energy
Location
Ping Europe Ltd, Corringham Road, Lincolnshire, DN21 1XZ, United Kingdom
Planning authority
West Lindsey
Planning application
146307

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 146307, with what the planning evidence pack adds for this site.

Every application in West Lindsey · Alerts for applications and incidents near here

  • 20 February 2023 Planning application submitted
  • 29 March 2023 Planning permission granted

None found. The register holds no published incident that names Ping Europe Limited, Corringham Road - Solar Array. If you know of one, report it (confidential reports are anonymised).

Has Ping Europe Limited, Corringham Road - Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ping Europe Limited, Corringham Road - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Ping Europe Limited, Corringham Road - Solar Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 May 2023.
Where is Ping Europe Limited, Corringham Road - Solar Array?
On the edge of Gainsborough, Lincolnshire, United Kingdom (postcode DN21 1XZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).