Gainsborough Road, Saundby - Solar Farm is a 78 MW solar farm 3.7 km west of Gainsborough, Nottinghamshire, United Kingdom. Its planning application (22/00358/FUL) went to Bassetlaw on 17 March 2022 and was granted on 14 July 2022. Construction started on 1 June 2026. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 34 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Gainsborough Road, Saundby - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 16 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster16 kmSignificant
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine57 kmMinor
EIR-12652024Solar panels catch fire and destroy three buildings in Harby57 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
78 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Enso Energy & Cero Generation
Location
E/O Bumble Bee Farm, Saundby Road, Gainsborough Road, Saundby, Nottinghamshire, DN22 9ER, United Kingdom
Planning authority
Bassetlaw
Planning application
22/00358/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/00358/FUL, with what the planning evidence pack adds for this site.

Every application in Bassetlaw · Alerts for applications and incidents near here

  • 17 March 2022 Planning application submitted
  • 14 July 2022 Planning permission granted
  • 1 June 2026 Construction started

None found. The register holds no published incident that names Gainsborough Road, Saundby - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Gainsborough Road, Saundby - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gainsborough Road, Saundby - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Gainsborough Road, Saundby - Solar Farm?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 June 2026.
Where is Gainsborough Road, Saundby - Solar Farm?
3.7 km west of Gainsborough, Nottinghamshire, United Kingdom (postcode DN22 9ER).