Solar · United Kingdom

Steeple Renewables Project

Operator Renewable Energy Systems RES Limited (Beaufort)

Awaiting Construction450 MWData checked 16 November 2026Source record dated 12 October 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Steeple Renewables Project is a 450 MW solar farm 4 km south-west of Gainsborough, Nottinghamshire, United Kingdom. Its planning application (EN010163) went to The Planning Inspectorate - National Infrastructure on 14 May 2025 and was granted on 9 October 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 40 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Steeple Renewables Project sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 17 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster17 kmSignificant
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine55 kmMinor
EIR-12652024Solar panels catch fire and destroy three buildings in Harby55 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
450 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Renewable Energy Systems RES Limited (Beaufort)
Location
West Burton Power Station, Sturton-le-Steeple, Retford, Nottinghamshire, DN22 9BL, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010163

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010163, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

Status changed from Application Submitted to Awaiting Construction on 16 November 2026.

  • 14 May 2025 Planning application submitted
  • 9 October 2026 Planning permission granted
  • 9 October 2031 Planning permission runs out

None found. The register holds no published incident that names Steeple Renewables Project. If you know of one, report it (confidential reports are anonymised).

Has Steeple Renewables Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Steeple Renewables Project; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Steeple Renewables Project?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Steeple Renewables Project?
4 km south-west of Gainsborough, Nottinghamshire, United Kingdom (postcode DN22 9BL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).