Planning pack for this site, £295Other options

Battery storage · United Kingdom

Gainsborough Road, Saundby - Battery Storage Facility

Operator Enso Energy & Cero Generation · Owner Enso Green Holdings A Limited

Under Construction120 MWData checked 16 November 2026Source record dated 8 June 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Gainsborough Road, Saundby - Battery Storage Facility is a 120 MW battery storage site 3.7 km west of Gainsborough, Nottinghamshire, United Kingdom. Its planning application (22/00358/FUL) went to Bassetlaw on 17 March 2022 and was granted on 14 July 2022. Construction started on 1 June 2026. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 34 other energy sites within 10 km, 12 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Gainsborough Road, Saundby - Battery Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 35 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells35 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool139 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire200 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
120 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Enso Energy & Cero Generation
Owner
Enso Green Holdings A Limited
Location
E/O Bumble Bee Farm, Saundby Road, Gainsborough Road, Saundby, Nottinghamshire, DN22 9ER, United Kingdom
Planning authority
Bassetlaw
Planning application
22/00358/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/00358/FUL, with what the planning evidence pack adds for this site.

Every application in Bassetlaw · Alerts for applications and incidents near here

  • 17 March 2022 Planning application submitted
  • 14 July 2022 Planning permission granted
  • 1 June 2026 Construction started

None found. The register holds no published incident that names Gainsborough Road, Saundby - Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Gainsborough Road, Saundby - Battery Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gainsborough Road, Saundby - Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Gainsborough Road, Saundby - Battery Storage Facility?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 June 2026.
Where is Gainsborough Road, Saundby - Battery Storage Facility?
3.7 km west of Gainsborough, Nottinghamshire, United Kingdom (postcode DN22 9ER).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).