Planning pack for this site, £295Other options

Solar · United Kingdom

Misterton PSD, Stockwith Road - Solar Panels

Operator Exolum

Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 4 March 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Misterton PSD, Stockwith Road - Solar Panels is a 0.4 MW solar farm 6.7 km north-west of Gainsborough, Nottinghamshire, United Kingdom. Its planning application (23/01500/FUL) went to Bassetlaw on 12 December 2023 and was granted on 23 February 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 17 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Misterton PSD, Stockwith Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster12 kmSignificant
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine61 kmMinor
EIR-12652024Solar panels catch fire and destroy three buildings in Harby62 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Exolum
Location
Misterton Petroleum Storage Depot Stockwith Road Walkeringham, Nottinghamshire, DN10 4JG, United Kingdom
Planning authority
Bassetlaw
Planning application
23/01500/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/01500/FUL, with what the planning evidence pack adds for this site.

Every application in Bassetlaw · Alerts for applications and incidents near here

  • 23 February 2012 Planning permission expired
  • 12 December 2023 Planning application submitted
  • 23 February 2024 Planning permission granted

None found. The register holds no published incident that names Misterton PSD, Stockwith Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Misterton PSD, Stockwith Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Misterton PSD, Stockwith Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Misterton PSD, Stockwith Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 March 2024.
Where is Misterton PSD, Stockwith Road - Solar Panels?
6.7 km north-west of Gainsborough, Nottinghamshire, United Kingdom (postcode DN10 4JG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).