← Back to Hampshire

Solar · United Kingdom

Owls Lodge Farm Extension

Operator Anesco · Owner Quanesco Midco Limited

Operational5 MWData checked 16 November 2026Source record dated 24 March 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Owls Lodge Farm Extension is a 5 MW solar farm 9.2 km east of Andover, Hampshire, United Kingdom. Its planning application (12/01186/FULLN) went to Test Valley on 9 July 2012 and was granted on 5 September 2012. It has been operating since 31 December 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 17 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 63 other sites and 375 energy sites within 40 km for Owls Lodge Farm Extension

Members see the sites and incidents around this one, and every record behind them.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW (this record)
All phases
10 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Anesco
Owner
Quanesco Midco Limited
Location
Nuns Walk Longparish Hampshire, Hampshire, United Kingdom
Planning authority
Test Valley
Planning application
12/01186/FULLN
First operating
2013

This record is 5 MW, one part of a site built in phases. With Owls Lodge Farm (5 MW) the phases on the register add up to 10 MW. Owls Lodge Farm

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 12/01186/FULLN, with what the planning evidence pack adds for this site.

Every application in Test Valley · Alerts for applications and incidents near here

  • 9 July 2012 Planning application submitted
  • 5 September 2012 Planning permission granted
  • 31 December 2013 Operational

None found. The register holds no published incident that names Owls Lodge Farm Extension. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Owls Lodge Farm Extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Owls Lodge Farm Extension; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Owls Lodge Farm Extension?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 March 2014.
Where is Owls Lodge Farm Extension?
9.2 km east of Andover, Hampshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).