Bullington Cross Wind Farm (3 of 14 turbines Test Valley BC)

Operator EDF

Appeal Withdrawn6 MWData checked 16 November 2026Source record dated 17 July 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bullington Cross Wind Farm (3 of 14 turbines Test Valley BC) is a 6 MW wind farm 13 km east of Andover, Hampshire, United Kingdom. Its planning application (13/00753/FULLN) went to Winchester on 25 April 2013 and was refused on 17 June 2014. Its status in the Renewable Energy Planning Database (UK government) is appeal withdrawn. There are 11 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 9 other sites and 398 energy sites within 40 km for Bullington Cross Wind Farm (3 of 14 turbines Test Valley BC)

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Appeal Withdrawn
Operator or applicant
EDF
Location
Land At Bullington Cross, Upper Norton Farm, Sutton Scotney, Hants, Hampshire, SO21 3QF, United Kingdom
Planning authority
Winchester
Planning application
13/00753/FULLN
Appeal reference
APP/C1760/W/14/3001604
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 13/00753/FULLN, with what the planning evidence pack adds for this site.

Every application in Winchester · Alerts for applications and incidents near here

  • 25 April 2013 Planning application submitted
  • 17 June 2014 Planning permission refused
  • 26 January 2015 Appeal lodged
  • 13 July 2015 Appeal withdrawn

None found. The register holds no published incident that names Bullington Cross Wind Farm (3 of 14 turbines Test Valley BC). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Bullington Cross Wind Farm (3 of 14 turbines Test Valley BC) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bullington Cross Wind Farm (3 of 14 turbines Test Valley BC); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Bullington Cross Wind Farm (3 of 14 turbines Test Valley BC)?
Appeal Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 17 July 2015.
Where is Bullington Cross Wind Farm (3 of 14 turbines Test Valley BC)?
13 km east of Andover, Hampshire, United Kingdom (postcode SO21 3QF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).