Onshore wind · United Kingdom
Barmoor South Wind Farm
Operator EDF
Operational13.8 MWData checked 16 November 2026Source record dated 20 January 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Barmoor South Wind Farm is a 13.8 MW wind farm 15 km south of Berwick-Upon-Tweed, Northumberland, United Kingdom. Its planning application (C/07/00180/CPC) went to Northumberland on 22 November 2007 and was granted on appeal on 21 January 2010. It has been operating since 19 January 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 4 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Barmoor South Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 13.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- EDF
- Location
- Between Ford And Lowick Bowsden Berwick-upon-Tweed, Northumberland, United Kingdom
- Planning authority
- Northumberland
- Planning application
- C/07/00180/CPC
- First operating
- 2015
- Turbines
- 6
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for C/07/00180/CPC, with what the planning evidence pack adds for this site.
Every application in Northumberland · Alerts for applications and incidents near here
Timeline
- 22 November 2007 Planning application submitted
- 17 December 2007 Planning permission refused
- 21 January 2010 Planning permission granted
- 21 January 2010 Appeal granted
- 1 March 2014 Construction started
- 19 January 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Barmoor South Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Barmoor South Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Barmoor South Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Barmoor South Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 January 2015.
- Where is Barmoor South Wind Farm?
- 15 km south of Berwick-Upon-Tweed, Northumberland, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).