Overton is a 4 MW solar farm 13 km west of Basingstoke, Hampshire, United Kingdom. Its planning application (14/01777/FUL) went to Basingstoke and Deane on 17 June 2014 and was granted on 18 December 2014. It has been operating since 15 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 9 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 61 other sites and 372 energy sites within 40 km for Overton

Members see the sites and incidents around this one, and every record behind them.

BRITISH SOLAR RENEWABLES LIMITED (07315867), active, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
British Solar Renewables
Owner
Owl Investment Bidco Limited
Location
Land Adjoining Lordsfield Plantation, The Lynch, Overton, Hampshire, Hampshire, United Kingdom
Planning authority
Basingstoke and Deane
Planning application
14/01777/FUL
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/01777/FUL, with what the planning evidence pack adds for this site.

Every application in Basingstoke and Deane · Alerts for applications and incidents near here

  • 17 June 2014 Planning application submitted
  • 18 December 2014 Planning permission granted
  • 1 October 2015 Construction started
  • 15 December 2015 Operational

None found. The register holds no published incident that names Overton. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Overton had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Overton; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Overton?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 March 2016.
Where is Overton?
13 km west of Basingstoke, Hampshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).