← Back to North Yorkshire

Energy sites / United Kingdom / North Yorkshire

Solar · United Kingdom

Os Field, Husthwaite - Solar Photovoltaic Array

Awaiting Construction49.9 MWChecked 6 October 2026Last changed in the dataset 7 November 2025

Technology
Solar
Capacity
49.9 MW
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Woolpots Solar Farm Limited
Location
OS Field 2700 Carlton Husthwaite, North Yorkshire, YO61 4PN, United Kingdom
Planning authority
North Yorkshire
Planning application
ZB23/02015/FUL
Appeal reference
25/00013/REFUSE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 29 September 2023 Planning application submitted
  • 4 November 2024 Planning permission refused
  • 25 April 2025 Appeal lodged
  • 14 October 2025 Planning permission granted
  • 14 October 2025 Appeal granted
  • 14 October 2028 Planning permission expired

None found. The register holds no published incident that names Os Field, Husthwaite - Solar Photovoltaic Array. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack sets out every comparable incident for one project, with sources. £295, by email in minutes.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.