Planning pack for this site, £295Other options

Solar · United Kingdom

Os Field, Husthwaite - Solar Photovoltaic Array

Operator Woolpots Solar Farm Limited · Owner Econergy International Limited

Revised49.9 MWData checked 16 November 2026Source record dated 10 January 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Os Field, Husthwaite - Solar Photovoltaic Array is a 49.9 MW solar farm 11 km south-east of Thirsk, North Yorkshire, United Kingdom. Its planning application (21/03042/FUL) went to North Yorkshire on 23 December 2021 and was granted on 26 January 2023. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 14 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

WOOLPOTS SOLAR FARM LIMITED (12727243), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Os Field, Husthwaite - Solar Photovoltaic Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1175, Rooftop solar panel fire guts NHS mental health ward in Malton, 28 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton28 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof55 kmMinor
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre56 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Woolpots Solar Farm Limited
Owner
Econergy International Limited
Location
OS Field 2700 Carlton Husthwaite, North Yorkshire, YO61 4PN, United Kingdom
Planning authority
North Yorkshire
Planning application
21/03042/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/03042/FUL, with what the planning evidence pack adds for this site.

Every application in North Yorkshire · Alerts for applications and incidents near here

  • 23 December 2021 Planning application submitted
  • 26 January 2023 Planning permission granted

None found. The register holds no published incident that names Os Field, Husthwaite - Solar Photovoltaic Array. If you know of one, report it (confidential reports are anonymised).

Has Os Field, Husthwaite - Solar Photovoltaic Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Os Field, Husthwaite - Solar Photovoltaic Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Os Field, Husthwaite - Solar Photovoltaic Array?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 10 January 2024.
Where is Os Field, Husthwaite - Solar Photovoltaic Array?
11 km south-east of Thirsk, North Yorkshire, United Kingdom (postcode YO61 4PN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).