Solar · United Kingdom

Northmoor

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational5 MWData checked 16 November 2026Source record dated 10 May 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Northmoor is a 5 MW solar farm 10 km south-east of Bude, Cornwall, United Kingdom. Its planning application (PA14/08271) went to Cornwall on 11 September 2014 and was granted on 21 November 2014. It has been operating since 31 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 34 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 176 energy sites within 40 km for Northmoor

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Whitstone Holsworthy Cornwall, Cornwall, EX22 6TD, United Kingdom
Planning authority
Cornwall
Planning application
PA14/08271
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA14/08271, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 11 September 2014 Planning application submitted
  • 21 November 2014 Planning permission granted
  • 22 November 2014 Construction started
  • 31 March 2015 Operational

None found. The register holds no published incident that names Northmoor. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Northmoor had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Northmoor; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Northmoor?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 10 May 2016.
Where is Northmoor?
10 km south-east of Bude, Cornwall, United Kingdom (postcode EX22 6TD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).