Land At Woodlands Farm
Operator Kronos Solar
Application Refused8 MWData checked 16 November 2026Source record dated 30 September 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Land At Woodlands Farm is a 8 MW solar farm 11 km south-east of Bude, Cornwall, United Kingdom. Its planning application (PA12/12014) went to Cornwall on 25 January 2013 and was refused on 2 January 2014. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 37 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Land At Woodlands Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
KRONOS SOLAR LIMITED (07241181), dissolved, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar
- Capacity
- 8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Kronos Solar
- Location
- North Tamerton Holsworthy, Cornwall, EX22 6SQ, United Kingdom
- Planning authority
- Cornwall
- Planning application
- PA12/12014
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PA12/12014, with what the planning evidence pack adds for this site.
Every application in Cornwall · Alerts for applications and incidents near here
Timeline
- 25 January 2013 Planning application submitted
- 2 January 2014 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Land At Woodlands Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Land At Woodlands Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land At Woodlands Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Land At Woodlands Farm?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 30 September 2015.
- Where is Land At Woodlands Farm?
- 11 km south-east of Bude, Cornwall, United Kingdom (postcode EX22 6SQ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).