Battery storage · United Kingdom
Pinkworthy Farm, Pyworthy - Battery Storage
Operator Private Developer · Owner Avils Consulting Limited
Awaiting Construction25 MWData checked 16 November 2026Source record dated 10 September 2024
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Pinkworthy Farm, Pyworthy - Battery Storage is a 25 MW battery storage site 9.1 km south-east of Bude, Devon, United Kingdom. Its planning application (1/0127/2024/FUL) went to Torridge on 7 March 2024 and was granted on 5 September 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 35 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Pinkworthy Farm, Pyworthy - Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pinkworthy Farm, Pyworthy - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 68 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0249 | 2026 | Smoke and fire incident at Battery Box, Pinhoe Road, Exeter | 68 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 203 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 308 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 25 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Private Developer
- Owner
- Avils Consulting Limited
- Location
- Pinkworthy Farm Pyworthy, Devon, EX22 6LQ, United Kingdom
- Planning authority
- Torridge
- Planning application
- 1/0127/2024/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 1/0127/2024/FUL, with what the planning evidence pack adds for this site.
Every application in Torridge · Alerts for applications and incidents near here
Timeline
- 5 September 2017 Planning permission expired
- 7 March 2024 Planning application submitted
- 5 September 2024 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Pinkworthy Farm, Pyworthy - Battery Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Pinkworthy Farm, Pyworthy - Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Pinkworthy Farm, Pyworthy - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Pinkworthy Farm, Pyworthy - Battery Storage?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 September 2024.
- Where is Pinkworthy Farm, Pyworthy - Battery Storage?
- 9.1 km south-east of Bude, Devon, United Kingdom (postcode EX22 6LQ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).