Onshore wind · United Kingdom

Mynydd Brombil Wind Farm

Operator REG Windpower

Operational8 MWData checked 16 November 2026Source record dated 18 April 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mynydd Brombil Wind Farm is a 8 MW wind farm 3.9 km south of Cwmafan, Neath Port Talbot, United Kingdom. Its planning application (P2012/0638) went to Neath Port Talbot on 29 August 2012 and was granted on appeal on 8 July 2015. It has been operating since 15 January 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 40 other energy sites within 10 km, 12 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 22 other sites and 310 energy sites within 40 km for Mynydd Brombil Wind Farm

Members see the sites and incidents around this one, and every record behind them.

REG WINDPOWER LIMITED (02431173), active, since 1989. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
REG Windpower
Location
Brombil, Port Talbot, Neath Port Talbot, United Kingdom
Planning authority
Neath Port Talbot
Planning application
P2012/0638
Appeal reference
APP/Y6930/A/14/2226525
First operating
2017
Turbines
4

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P2012/0638, with what the planning evidence pack adds for this site.

Every application in Neath Port Talbot · Alerts for applications and incidents near here

  • 29 August 2012 Planning application submitted
  • 7 January 2015 Appeal lodged
  • 8 July 2015 Planning permission granted
  • 8 July 2015 Appeal granted
  • 1 February 2016 Construction started
  • 15 January 2017 Operational

None found. The register holds no published incident that names Mynydd Brombil Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Mynydd Brombil Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mynydd Brombil Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Mynydd Brombil Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 April 2017.
Where is Mynydd Brombil Wind Farm?
3.9 km south of Cwmafan, Neath Port Talbot, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).