Battery storage · United Kingdom
Y Bryn Wind Farm
Operator ESB & Coriolis Energy
Application RefusedData checked 16 November 2026Source record dated 19 January 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Y Bryn Wind Farm is a battery storage site 4.1 km south-west of Maesteg, Neath Port Talbot, United Kingdom. Its planning application (DNS/3264571) went to Welsh Government (NSIP) on 20 December 2023 and was refused on 21 November 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 40 other energy sites within 10 km, 6 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Y Bryn Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- ESB & Coriolis Energy
- Location
- Ffordd y Frenhines, Margam, Neath Port Talbot, CF34 9PU, United Kingdom
- Planning authority
- Welsh Government (NSIP)
- Planning application
- DNS/3264571
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DNS/3264571, with what the planning evidence pack adds for this site.
Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here
Timeline
- 20 December 2023 Planning application submitted
- 21 November 2025 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Y Bryn Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Y Bryn Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Y Bryn Wind Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Y Bryn Wind Farm?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 19 January 2026.
- Where is Y Bryn Wind Farm?
- 4.1 km south-west of Maesteg, Neath Port Talbot, United Kingdom (postcode CF34 9PU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).