Battery storage · United Kingdom

Y Bryn Wind Farm

Operator ESB & Coriolis Energy

Application RefusedData checked 16 November 2026Source record dated 19 January 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Y Bryn Wind Farm is a battery storage site 4.1 km south-west of Maesteg, Neath Port Talbot, United Kingdom. Its planning application (DNS/3264571) went to Welsh Government (NSIP) on 20 December 2023 and was refused on 21 November 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 40 other energy sites within 10 km, 6 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 1 other site and 340 energy sites within 40 km for Y Bryn Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
ESB & Coriolis Energy
Location
Ffordd y Frenhines, Margam, Neath Port Talbot, CF34 9PU, United Kingdom
Planning authority
Welsh Government (NSIP)
Planning application
DNS/3264571

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DNS/3264571, with what the planning evidence pack adds for this site.

Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here

  • 20 December 2023 Planning application submitted
  • 21 November 2025 Planning permission refused

None found. The register holds no published incident that names Y Bryn Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Y Bryn Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Y Bryn Wind Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Y Bryn Wind Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 19 January 2026.
Where is Y Bryn Wind Farm?
4.1 km south-west of Maesteg, Neath Port Talbot, United Kingdom (postcode CF34 9PU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).